Home > Projects > Cruising > Cruising Yachts > Svea J-S1

J-Svea

History first, The new J Class Yacht Svea was launched in January 2017 to an original hull linesplan of Thore Holm made in 1937. Fast forward, this spectacular new J took 80 years to finally touch the water and is one of the most promising new J-Class Yachts built to date.


High-tech construction, Equiplite® NEXt™ deck and sail hardware specifications ensure a J-Class Formula one capabilities.


Supplied by Vitters Shipyard BV:


Deck hardware:

product: workload:  
8x All-round Snatch blocks 9.5T MWL.  
2x LEAD blocks* 9.5T MWL.  
6x UPSTAND blocks* 9.5T MWL.  
IN-Focker`s 12T MWL.  

* Rated 20T and up “plug-&-play” installed on removable swiveling padeyes


Supplied by Doyle Rigging:


Sail hardware:

LION`s Furling Top Swivel  


Running rigging hardware:

NS connectors (8-10-15T MWL. )  
SWIv™ (halyard swivels)  

Technical Data

 LOA 43,6m
 LWL 27.6m
 Beam

6.65 m

 Draft 4.72 m
 Sail Area

704 m2

 Yard Vitters Shipyard
 Year 2017



Naval Architect:

Hoek Design
www.hoekddesign.com


Exterior design:

Pieter Beeldsnijder
www.pieterbeeldsnijder.com


Shipyard:

Vitters
www.vitters.com


Related Articles:

Not available