Home > Projects > Cruising > Cruising Yachts > Rogers 82

680proj-cruisingyachts-roger82.jpg-2012-04-02-13-46-00-

Supplied by Equiplite Europe:

- Deck hard ware:
- Tackline Block
- Mastbase Blocks with the new type Equiplite Upstand system
- Lead Blocks to winches
- Around Snatchblocks

- Running Rigging Hardware:
- Jib Connecters
- Main Halyard Connector
- Halyard Swivels

- Code 0 Furling systems. (With build in locks system -from Hall Spars- in top swivel.)
- Spinnaker staysail system
- Structural Stay sail Furling system


Cables supplied by Equiplite Europe:

- Code 0
- Stay sail
- Spi staysail

Technical Data

LOA 25 m
Draft (fixed keel) 4.6 m
Racing displacement 30 Tons
Cruising displacement             40 Tons
Diesel 1200 Litres
Freshwater 1000 Litres
Ballast ratio 55%
Construction Pre-preg carbon
Rig (hall spars) Carbon 3 Spreaders
Rigging PBO
Interior Styling Roger Yacht Design
Structures SP Gurrit
CFD Egan consultans
Builder Goetz custom boats
Launch date Spring 2010